TCG delivered A&A, fit-out, MEP, and façade works for a global tech brand’s flagship retail store at IFC Hong Kong, spanning 27,514 sq.ft. over two phases in 8 months. The project features high-spec finishes and the construction of an iconic internal staircase. The build showcased meticulous detailing, innovative construction methods, and seamless integration with the mall’s structural and service infrastructure.


